Naturgy Teams With Hispania Silva To Build at Least 20 Biomethane Plants

In Spain, Naturgy has signed a strategic alliance with Hispania Silva, a company specialising in waste recovery with extensive experience in the agricultural sector, for the construction of a minimum of 20 biomethane production plants, which could reach up to 30. The plants that form part of this alliance, which will be distributed throughout Spain and will be operational before 2030, will have the capacity to generate 2.5 TWh of biomethane per year, equivalent to the consumption of 500,000 homes. In addition, they will contribute to the decarbonization of our economy, with the reduction of 450,000 tonnes of CO2, equivalent to the planting of 49 million pine trees.

Read more here.

Previous
Previous

Vanguard Renewables Breaks Ground on Gas Facility

Next
Next

Nicor Gas Marks First RNG Interconnection in Illinois